RomeNewswire.comHome RomeNewswire.com Login RomeNewswire.com Register RomeNewswire.comContact Us
Rome News, Rome Georgia, Georgia News, Rome Online, Rome Weather, Rome Headlines, Georgia Newswire
Rome News, Rome Georgia, Georgia News, Rome Online, Rome Weather, Rome Headlines, Georgia Newswire

Rome News, Rome Georgia, Georgia News, Rome Online, Rome Weather, Rome Headlines, Georgia Newswire

Rome News, Rome Georgia, Georgia News, Rome Online, Rome Weather, Rome Headlines, Georgia Newswire

 

Flaw Found In Design Of New RR Bridge Over Martha Berry Blvd.

An engineering design issue has been discovered at the new railroad overpass on Martha Berry just south of John Davenport Drive.

DOT Board member David Doss from Rome says the project involves the welding of the rails to the bridge and that the problem can be corrected and the contractors still meet the December 31st completion date for the project.

Cost of the repair is estimated at more than $90,000.


You must be logged in to post a comment.

Details about the post you're currently reading:

  • Title: Flaw Found In Design Of New RR Bridge Over Martha Berry Blvd.
  • Written on: May 29th, 2008
  • 0 comments
  • 3 trackbacks